Verifying Pipe Vibration Against VDI 3842 During Compressor Plant Site Approval Tests
A new natural gas booster plant at Winksele, Belgium, was undergoing Site Approval Tests (SAT) after the end of construction. The SAT scope included a pipe vibration level assessment to verify that all vibration levels were within acceptable limits. This case study describes the measurement campaign and the VDI 3842

Dynamic Analysis of Fatigue Cracking in a Compressor Suction Strainer
Compressor Suction Strainer and Its Fatigue Cracking The suction strainer of a centrifugal compressor developed fatigue cracks. The strainer is a perforated stainless steel truncated cone (Werkstoff 1.4571), 970 mm long, with an outside diameter of 160 mm at the upstream end and 420 mm at the downstream end. The

Pulsation and Vibration Analysis of Seal Gas Compressor Piping
Operating Context and Damper Configuration Assumed At a plant in Qatar, a Dresser Roots compressor compresses seal gas in two stages. The client requested a simulation study, both acoustic and mechanical, of the compressor piping between the first-stage discharge and the second-stage suction. The second-stage bypass lines are included. The

Pre-Construction Pulsation and Vibration Analysis of a Centrifugal Compression Station
Why Pulsation Risks Warranted Attention Before Operation The compression station was designed to increase and maintain operating pressure on a natural gas piping network, overcoming friction losses. It has four (3+1) two-stage centrifugal compressors with 19-blade impellers, running at a rated speed of 5750 RPM (95.8 Hz) within a range

CFD Root Cause Analysis of a Recirculation Silencer Failure
A Commissioning Failure That Sent Debris Downstream During commissioning of a natural gas compressor station, pieces of fibreglass fabric, mineral wool and steel wire were found throughout the downstream system. A small amount of mineral wool was also found in the surge valve. Inspection showed that the mineral wool found

Compressor Nozzle Load Feasibility for Floating LNG Suction and Discharge Piping
Compressor Piping Under Combined Marine and Process Loading The compressor module was located roughly halfway along the hull. Its connected piping had to accommodate thermal and pressure loads, wind loads, accelerations from wave-driven barge rocking and relative displacements from hull deformation. These loads could produce pipe deflection and bending and

Thermal Fatigue Assessment of an Air-Cooled Heat Exchanger Under Cyclic Duty
Cyclic Thermal Duty in a Gas Treatment Air Cooler An air-cooled heat exchanger for a gas treatment plant is subjected to a varying inlet temperature. In the analysed winter case, which has the largest temperature variation, the fluid cycles between 7.5°C and 288°C during each 100-minute cycle. The first part

Flow-Induced Vibration Control on a Single-Line Gas Metering Skid
Consolidating Gas Flow onto a Single Metered Line A platform gas metering station has three parallel metering lines, two active and one spare. The modification replaces the orifice-type flow meter in the most eastern line with an ultrasonic (US) flow meter and directs the complete gas flow through that line.

Pipe Stress Analysis and Structural Verification of a Nitrogen Metering Skid
Nitrogen Skid Stress Verification Requirement A manufacturer produces a nitrogen metering skid for a project. As a result of a client performance requirement, the existing design had to be verified by stress analysis. The skid is a straight pipe configuration with valves and flow meters, supported approximately 1000 mm above

ASME VIII Division 2 Fatigue Analysis of a Flued Flange Expansion Joint
An axisymmetric finite element analysis checked the flued flange expansion joint of a fixed-fixed tubesheet reboiler for low cycle fatigue, high cycle fatigue and primary stress to ASME Section VIII Division 2, at mean (26 mm) and minimum (22 mm) wall thickness. The largest low cycle fatigue stress range was

Static Stress Analysis for Gas Air Cooler Systems
The station model of the Winksele Compressor Station, to be built in Belgium, was divided into two models with some mutual overlap, a compressor model and a filter model, each covered by a separate stress report. A third report covers the gas air coolers as model C, an add-on to

Longitudinal Stress Assessment of a Buried-to-Above-Ground Separator Connection
An additional separator was installed in Phase 2 of a cluster project and was to be connected to the existing lines through a modified above-ground (A/G) manifold. The manifold also connects to an existing buried (underground, or U/G) line. The analysis applied pressures of 100 / 225 Barg and temperature

Static Stress Analysis of a Gas Metering Skid with Structural Steel
A combined CAESAR II model of a gas metering skid and its structural steel frames was assessed against ASME B31.3 (2006). The piping stresses were below the allowables, the steel stresses were within the allowable limits for the sustained and expansion load cases, and several bolt shear loads exceeded the

Static Stress Analysis of a Multi-Mode Gas Metering Skid
Multi-Mode Metering Skid with Undefined Connecting Piping The unit assessed was a 24-inch, 300# ethane metering skid. Gas can be routed through a normal operating line (line 1), a testing and maintenance line (line 2), two flow control lines (lines 3 and 4) and a bypass. No more than one

Reviewing a Buried GRP Fire Water System by Pipe Stress Analysis
CAESAR II stress analysis of 13 critical sections of a buried GRP fire water system, to ISO 14692, expected no problems for the underground piping under pressure and temperature loads. High stresses occurred in vertical above-ground GRP pipes where the pipe is vertically restrained; in section D, guide and rest

Static Stress Analysis of an Underground GRE Firewater System
Seventeen underground GRE firewater subsystems at a degassing station were analysed in CAESAR II for three load cases, hydrotest, operational and sustained, to ISO 14692. It may be concluded that, upon implementation of the recommendations, the static pipe stresses are acceptable and the flange loads are moderate. Underground GRE Firewater

Static Stress Analysis of a Buried GRE Firewater System Upgrade
Thirteen buried GRE firewater subsystems were modelled in CAESAR II and assessed to ISO 14692 for hydrotest, operating and sustained load cases. On implementation of the recommendations, static pipe stresses are acceptable and flange loads are moderate. The buried glass-reinforced epoxy (GRE) piping in the firewater system upgrade at a

GRE Firewater Line on a Jetty with Moving Trestles
The main firewater line for a new oil terminal jetty is made from glass reinforced epoxy (GRE) pipe. It starts at the onshore transition between underground and above-ground pipe, where it connects to steel lines, and follows a jetty about 1.5 km long. A firefighting platform about one third of

Stress Analysis of a Buried GRE Firewater System at a Degassing Station
Static stress analysis of two buried GRE firewater subsystems in CAESAR II covered three load cases with a design pressure of 13.4 barg and a maximum design temperature of 40 °C. The stress analysis report, a preliminary issue, records wall thickness increases and polystyrene on five isometrics and concludes that,

Stress Analysis of an Underground GRE Firewater Extension
Nine underground GRE firewater systems, 77 stressed isometrics in total, were analysed in CAESAR II against the ISO 14692 allowable stress envelopes, with soil-pipe interaction modelled to the American Lifelines Alliance (2001) soil model. Modifications included a support bracing, polystyrene foam, NBR gasket stiffness limits and additional laminate for a

ISO 14692 Stress Analysis of a Buried GRE Firewater Network
A CAESAR II static stress analysis of a buried GRE firewater network against ISO 14692 found 18 bends and 10 tees overstressed in the original design. In the modified models, all stress points are within the ISO 14692 envelopes for the sustained, operational and hydro load cases, provided the system