Dynaflow Research Group

  • Engineering
    • Projects
    • Mechanical
    • CFD & Surge Analysis
    • Pulsations & Vibrations
    • Fiberglass Engineering
    • Geothermal Wells
  • Software
    • BOSfluids
    • BOSpulse
    • FEPipe
    • NozzlePRO
    • FEATools
    • Jive
    • ISOtracer
    • BOSview
    • BOS B31
  • Training
  • Career
  • News
  • Contact
Skip to content

Dynaflow Research Group

Advanced Solutions in Engineering
  • Engineering
    • Projects
    • Mechanical
    • CFD & Surge Analysis
    • Pulsations & Vibrations
    • Fiberglass Engineering
    • Geothermal Wells
  • Software
    • Flow Analysis
      • BOSfluids
      • BOSpulse
    • Structural Analysis
      • FEPipe
      • NozzlePRO
      • FEATools
    • Academic
      • Jive
    • Tools
      • ISOtracer
      • BOSview
      • BOS B31
  • Training
  • Career
  • News
  • contact

Fiberglass piping design and installation for a petrochemical plant

10 Dec 2020

DRG provides a complete set of engineering and consultancy services for Fiberglass piping (FRP) networks. This includes detailed engineering studies, product development, factory audits, site supervision, FEED support, third-party review for EPC projects and root-cause investigation of failures.

 
DRG recently completed a third-party review project for the construction of a large petrochemical plant in Oman. This included an assessment of procured materials and factory audits, review of all engineering, drawings and other preparation, as well as weekly site supervision visits to cover activities such as jointing and hydrotesting. Also during these visits, assistance is provided by solving and engineering the difficulties that may occur at site, where the reality is always more tenacious than anticipated during the engineering phase.

The project was executed from the Middle East office of DRG. “With such large projects there are many different parties and people involved that mistakes are easily made”, explains Edwin Schimmel. “Because the engineering reviews, factory audits and site inspections are performed all by the same team from DRG, mismatches between design and practice are easily recognized. The installation of the Cooling Water system and Firewater system was completed troublefree late 2019.

For more information, please contact:

Edwin Schimmel
Project Engineer

Phone: +971 (0)4 447 4479

Relevant articles:

  • Infield inspections Oman
  • Third-party review fiberglass EPC project Oman
  • Related news

    3 June 2022
    DRG

    DRG welcomes David Gonzalez Pomares

    READ INFO
    2 June 2022

    FRP Pipe Stress Analysis Webinar – Use of the pipe stress envelope according to the design standard ISO 14692

    READ INFO
    13 May 2022

    Exhange Program Dynaflow and Stressman Engineering

    READ INFO
    • Dynaflow Dynaflow Research Group is ISO:9001 certified.
      ISO 9001:2015
      certified
    • HEAD OFFICE

      Laan van Oversteen 20
      6th floor
      2289 CX Rijswijk
      The Netherlands

    • MIDDLE EAST OFFICE

      Bay X2 Tower, Unit 3109
      Jumeirah Lakes Towers, cluster X
      P.O. Box 73001, Dubai
      United Arab Emirates

    • CONTACT

      Phone: +31 (0)85 058 0046
      E-mail: infoaanvraag@dynaflow.com

    • © Dynaflow Research Group BV

      • Terms & Conditions
      • Privacy Policy
      • Cookie policy (EU)
      • About us
      • Contact