
Dynaflow webinars online
Dynaflow Research Group regularly hosts technical webinars. These webinars, which are FREE to watch, are recorded and made available online through our YouTube channel. A

Dynaflow Research Group regularly hosts technical webinars. These webinars, which are FREE to watch, are recorded and made available online through our YouTube channel. A

Starting February 11th 2020, our Software Director Erik Jan Lingen together with Matthias Möller from the Faculty of Mathematics will present a course (WI4265TU) on

Upcoming week February 11-13, Dynaflow hosts its latest Fiberglass Engineering training course. During this course participants receive a good understanding of the GRP specific mechanical

Dynaflow Research Group (DRG) has recently been accredited with the quality management standard NEN-EN-ISO 9001:2015. Today, Niels Bos from Dynaflow Research Group received the official ISO9001 certificate from Vincent

There has been a demand for Online FEPipe and NozzlePRO training courses for many years. We are happy to announce that next month we will

For the last couple of months DRG is expanding its training activities online in association with the e-learning platform EngineeringTrainer.com. Our newest online course regards

Besides classroom courses taught at our offices in The Netherlands, The Middle-East or at client premises, we are expanding our training portfolio with online courses.

DRG hosting the ISO/TC 138/SC 6 and WG’s meetings Zoetermeer, 17, 18 and 19 September DRG is hosting the 3-day ISO/TC 138/SC 6 and WG’s

Tuning a beam type FEA model to vibration measurements from the piping of a reciprocating compressor plant Vibrations had been seen in the piping of

DRG presents at the Dutch OpenFOAM User’s Group 2018 DRG is actively involved in the research and application for Computational Fluid Dynamics (CFD) and Discrete

API 674 Acoustical study, some differences between design approach 1 (DA1) and design approach 2 (DA2) When purchasing or delivering a reciprocating pump an API674

Recently in the fall of 2017 a renewed edition of the ISO14692, the governing standard for fiber reinforced plastic piping, was officially released. The objective

B31J: The answer to Markl’s 1950’s flexibilty factors The new 2017 ASME B31J Up to recent years most pipe flexibility analyses and more specifically Caesar

DFC2017 keynote: Simulation requirements for oil and gas transport in pipeline systems Presentation by Prof. dr. ir. Ruud A.W.M. Henkes (Shell Projects and Technology/Delft University

DFC2017 abstracts: Efficient Industrial Conjugate Heat Transfer in HELYX v3 Presentation by Dr. Eugene de Villiers PhD. MSc. DIC (Engys UK) DRG is proud to

DRG at the Multiphase Production Technology 2017 Conference Cannes 7-8-9 June 2017 in Cannes, France In the first week of June 2017, DRG attended the

Analysis of Surge problems with CAESAR II and BOSfluids 5.4 The webinar Together with Hexagon PPM, DRG is co-hosting a free webinar on Analysis of

DRG’s Richard Fawcett looks at the importance of designing for pressure surges in an LNG bunkering line. February 2017 In the February issue of LNG

Meeting the challenges of Oil & Gas The Oil & Gas and petrochemical field can be prone to difficulties when it comes to efficiency, flow

Bridging the gap between research and field work Dynaflow Research Group will be presenting two papers at the 3rd International Rotating Equipment Conference on September

Alba B3 platform installed – DRG performed surge analysis It is always nice to see your computer models becoming reality! DRG performed a surge analysis

Table of Contents A Good GRP Code Covers a Large Variety of Products and Loading Conditions A robust Glass Reinforced Plastic (GRP) piping code must

Thermal bowing is a structural phenomenon that arises when a temperature gradient exists across the cross-section of a pipe or vessel. In typical pipe design,

Table of Contents As the demand for flexible, energy-efficient, and reliable compressor operation grows—particularly in hydrogen and process gas applications—our clients increasingly turn to stepless

Table of Contents Multiphase flow is a recurring challenge in process engineering, where multiple fluid phases—such as gases, liquids, or solids—interact within a single flow

In the chemical and energy industries, liquid products such as LNG, ammonia, or naphtha are commonly transferred between ships and onshore storage tanks. These transfers

In the engineering domain, accurately simulating transient events in pipeline systems is critical, particularly for essential safety mechanisms such as firewater systems. These systems, typically

Introduction Pressure vessels are critical components in a wide range of industries, including power generation, petrochemical processing, and industrial manufacturing. These vessels are designed to

When Theodor von Kármán first discovered vortex shedding in 1911, he likely had no idea how pivotal his work would become for modern engineering, particularly

In a previous article, we introduced the risks and design considerations of repurposing an existing natural gas compressor system for hydrogen. That discussion focused on

ON-DEMAND 🕖 30 MIN 🌏︎ ENGLISH Understanding and Mitigating AIV and FIV in Modern Plant Design David Tickner Senior Engineer Get instant access

ON-DEMAND 🕖 30 MIN 🌏︎ ENGLISH How To Predict Stresses From Slug Flows Daniëlle de Jong Senior Engineer Get instant access Free recording

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Building models using the import PCF file feature & model verification In BOSfluids Thijs Krijger Project Engineer

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Solving Vibrations In A Two-Phase Process Line Frank Bos Partner Get instant access Free. Recording + slide

ON-DEMAND 🕖 50 MIN 🌏︎ ENGLISH Surge and dynamic stress analysis for an offshore wind farm using BOSfluids Mark Groen Software Lead Engineer

ON-DEMAND 🕖 25 MIN 🌏︎ ESPAÑOL Integración de BOSfluids con Caesar II y otros programas de tensión de tuberías Uri Peker Engineer Get instant

ON-DEMAND 🕖 35 MIN 🌏︎ ENGLISH BOSfluids integration with CAESAR II and other pipe stress programs Ryan Metcalf Manager USA Get instant access

Dynaflow ran a finite element analysis to ASME VIII Division 2 of a stainless steel SA240 316L support ring welded into a carbon steel Claus reactor. All primary stresses were within the allowable. At the head-to-ring connection, however, secondary stress reached 885 MPa (259 percent of the allowable), and fatigue

Two identical condensers cool sulphur gas to a temperature close to its dew point. The gas passes through 363 SA-179 tubes of 38.1 mm outside diameter and 8840 mm straight length, set on a 48 mm triangular pitch between two stationary tube sheets. On the shell side, water maintains a

New water hydrants were installed as part of an upgrade of the firewater system at a main degassing station. Each hydrant valve joins the steel hydrant part to the underground glass-reinforced epoxy (GRE) piping, and the GRE piping connects to steel piping coming from the above-ground equipment. The GRE is

Firing of three relief valves on a steam line operating at 225 °C and 9.5 barg was analysed in CAESAR II, with dynamic loads generated in BOSfluids. The spectrum analysis gave a combined dynamic and static stress of 128% of the occasional allowable stress and the time-history analysis including the

Condensation and Steam Hammer in a Cold Steam Line The analyses assumed steam at 380°C and 40 Barg entering a 36-inch high-pressure steam line with a pipe temperature of +5°C. Potential problems are anticipated at start-up because the steam condenses on entering the cold pipe. Steam remaining in the line

A BOSfluids surge analysis and slug impact calculation of a 12-inch steam start-up line gave maximum unbalanced forces of 1.32 kN, 1.3 kN and 3.2 kN for three surge scenarios, and 16.5 kN and 23 kN for 7 m and 10 m slug impacts on the pressure control valve. CAESAR

During re-alignment of the suction and discharge piping for sales gas compressors K2002A and K2002B, ready for connection to the compressor nozzles, the discharge line of K2002B could not be correctly aligned. The displacement at constant load hanger 04-SS-1017 (PS 1017) took the hanger out of its operating range. A

A CAESAR II stress analysis of a revised high-pressure blowdown line operating at 20.6 barg and 160 °C found that the system as proposed did not meet ASME B31.3 because of large thermal displacements of the DN600 header. If guide support S1 is replaced by a restraint in the z-direction

At a refinery, instrument air is supplied by three Atlas Copco compressors. Two are motor driven; the third is driven by a Coppus RHLA-24 steam turbine commissioned in 2008. Two months after start-up, a plain bearing malfunctioned. The turbine was overhauled and reassembled at site in August 2009, after which

Weld 34 Crack and Dead-End Configuration The circulation system has two pumps, one operating and one spare. The operating pump feeds cooling water back into the Benson vessel at the top of the system. In the situation analysed, one pump had been taken out for revision. A blind valve was

Branch Failures in a Buried GRP Firewater Ring The firewater system is made from glass-reinforced plastic (GRP) pipe and is mainly underground. The main is a ring with large-bore branch connections, and smaller-bore branch connections feed the hydrants and monitors above ground. In early operation the system suffered a number

Slug Flow Operation and Two Elbow Fatigue Failures At a gas-to-liquids facility, the water feed line to an HCN/NH3 stripper (1C-1201) regularly operated in the slug flow regime. Slugs can generate large dynamic loads on the piping, which can eventually result in fatigue failures. Two leakage incidents occurred, each caused

Flange Leakage in 44-Inch Catalytic Oxidiser Piping The 44-inch top and bottom nozzles of a catalytic oxidiser are connected to the shell and tube sides of a recuperative heater by 44-inch piping. The hot design temperature is 527 °C. The required piping flexibility is provided by a number of expansion

Steam-Out Cycles of the Carbon Bed Vessels In the offgas cleaning system of an EBHP reaction section, vessels V105A to V105D absorb EB from the offgas on active carbon beds, because the EB has to be removed before flaring for environmental reasons. Once a bed is saturated, it is steamed

A Branch Failure on a Methanol Plant Steam Header A methanol plant operating on a 3,000 tonnes per day basis suffered a piping failure on 19 May 2012. A ¾ inch branch broke off the medium-pressure (MP) steam header when the turbine driving the synthesis gas compressor tripped. In normal

A pulsation analysis to API 618 Design Approach 1 checked the proposed dampener bottles of onshore and offshore reciprocating compressors against a guideline of 70 percent of the allowable pulsation levels. All proposed bottles gave levels within the API 618 allowable. At the line connection nozzle, only the offshore discharge

Condensate Forwarding Duty at a Nigerian Gas Plant At a gas plant in Nigeria, four reciprocating pumps on an N+1 philosophy (three running, one spare) forward condensate from a storage and separation tank into a gas pipeline. A 12-inch suction header carries the condensate from the tank to the pumps,

Severe Vibration in Vaporiser Feed Pump Piping The suction and discharge piping connected to the quadruplex methanol vaporiser feed pumps was suffering from severe vibration. A pulsation analysis combined with a mechanical response analysis of the as-built piping was performed to establish the root cause. The analyses determined the stress

At the Utorogu Flow Station in Nigeria, vibration was observed in the suction header, the discharge header and the pump recirculation line. Dynaflow Research Group performed pulsation, mechanical response and static stress analyses to find the root cause, identify any other possible problems and recommend improvements. The station pumps crude

A third-party review of the HP discharge line at a gas compression station found that the designer’s stress report shows the discharge nozzle conforming to the vendor’s allowable values with the springs pinned, as API 686 requires. At the 7th April alignment check the flange separation exceeded the 4.5mm vendor

A new natural gas booster plant at Winksele, Belgium, was undergoing Site Approval Tests (SAT) after the end of construction. The SAT scope included a pipe vibration level assessment to verify that all vibration levels were within acceptable limits. This case study describes the measurement campaign and the VDI 3842

DYNAFLOW RESEARCH GROUP (“DRG”) Enters into Reseller Agreement with Quality Professional Software (“QPS”) RIJSWIJK, The Netherlands – January 24, 2024 (Dynaflow Research Group BV) –

Dynaflow Research Group and Seawind Ocean Technology announce collaboration focusing on technical readiness of floating offshore wind applications in the Mediterranean Sea. This landmark partnership