Pressure Thrust and Surge Loads on a DN600 GRE Seawater Header

ON THIS PAGE

GRE Header Design Conditions and Material Properties

An above-ground seawater header in glass-fibre reinforced epoxy (GRE) supplies seawater to a process unit through two tie-ins on a seawater pump discharge manifold. The analysis assessed the static stresses in the header and defined a support arrangement that supports and stabilises the line and keeps the stresses within allowable values.

The GRE pipe and elbows are EST 20 and the DN700xDN600 tee is EST 12.5. The material properties apply to all GRE pipe and fittings:

  • short-term bi-axial (2:1) hoop strength of 250 MPa
  • short-term uni-axial strength of 65 MPa
  • qualified hoop stress of 125 MPa
  • long-term allowable axial stress of 32.5 MPa

The axial and hoop elastic moduli are 10,500 MPa and 20,500 MPa.

The design pressure is 10 barg. The design temperatures of 25°C and 5°C give an increment and a decrement of 10°C relative to the 15°C installation temperature. Two further load sources were addressed in the restraint design.

Expansion Joint Pressure Thrust and Unbalanced Surge Loads

The first was pressure thrust at the 700 mm diameter rubber expansion joint at tie-in 2. If the expansion joint is not axially restrained, the pressure thrust cannot be accommodated and is transferred to other structural elements. The thrust components acting on the GRE elbows between the expansion joint and elbow 3 (one of four elbows numbered 1 to 4 in the model) then have to be accommodated by pipe bending. In that case, the analysis showed that the bending stresses exceed the allowable limits.

The second was pressure transients. A surge analysis performed by others supplied unbalanced loads of 100 kN and 200 kN acting at elbows 1 to 4. The 100 kN load is aligned with the section between elbows 1 and 2. The 200 kN load is aligned with the straight section between elbows 3 and 4, which runs towards the unit. No other surge conditions, such as vacuum, were specified.

CAESAR II Model, Load Cases and Flange Check

The system was modelled and assessed in CAESAR II against ISO 14692. The steel sections of the discharge manifold were modelled for continuation only. The connection at tie-in 1 was modelled to include the expansion of the discharge manifold, and the nozzle at tie-in 2 was modelled as an anchor. The allowable stress values of the GRE material were used to construct the allowable stress envelope against which the pipe stresses were assessed.

CAESAR II model layout of a DN600 GRE seawater supply header, with steel discharge manifold sections at the left.
CAESAR II model layout of a DN600 GRE seawater supply header, with steel discharge manifold sections at the left.

Fourteen load cases were defined:

  • Hydrotest (1 case): applies the hydrotest pressure of 15 barg.
  • Operational (2 cases): each combines the weight of pipe and water content, the design pressure, and either the hot (25°C) or the cold (5°C) design temperature.
  • Sustained (1 case): combines weight and design pressure.
  • Expansion (2 cases): the differences between each operational case and the sustained case.
  • Occasional (8 cases): the surge loads were applied in four combinations, F1 to F4, each loading a pair of elbows simultaneously (elbows 2 and 3, 1 and 3, 2 and 4, and 1 and 4). Each combination was run twice, with weight, design pressure and either the hot or the cold design temperature.

Flange loads were assessed with the CAESAR II flange check in all load cases except the two expansion cases, which were assessed for the pipe only. The external axial force and bending moment on each flange were converted into an equivalent internal pressure:

p_eq = 4F_axial/(πD²) + 16M_bending/(πD³)

D is the gasket sealing circle, conservatively set equal to the pipe inner diameter. The axial force was taken as zero when compressive.

The equivalent pressure was added to the line pressure. The resulting pressure loading was compared against an allowable pressure rating which, in accordance with the pipe manufacturer’s specification, is twice the line pressure rating multiplied by a safety factor f.

Table 1 | Load cases and flange safety factors

Load case typeNumber of casesFlange safety factor f
Hydrotest10.89
Operational20.83
Sustained10.67
Occasional80.89
Expansion2Not checked (pipe only)

Tie-Rods, Axial Stops and Three-Way Stops

Tie-rods are required at the expansion joint to accommodate the pressure thrust. They must be attached to the expansion joint flanges with nuts on both sides of the flange. The expansion joint is restrained in extension and compression, and only lateral translation is unrestrained. An axial stop was also added in the DN600 pipe between tie-in 1 and tie-in 2.

Three-way stops at nodes 220 and 730 were placed to take the surge loads and carry axial loads close to 100 kN and 200 kN respectively. The existing axial stop in the straight section towards the unit is subject to a large axial load from the 200 kN unbalanced load. The collars planned on the pipe at this location can accommodate this load. However, the steel substructure sketched on the received drawing appears to be undersized. As the pipe runs in a trench, the recommendation is to connect the stop and guide function to the side wall of the trench.

GRE Pipe Stress, Flange and Support Load Results

With the tie-rods and the added axial stop implemented, the GRE pipe stresses and all GRE flange loads are within the allowable values, and the system is compliant with the requirements for stress and loads. Support loads were calculated per load case and listed in a restraint summary. Its node numbers relate to the marked-up isometrics on which the modifications are shown.

Rubber Seal Lock Joints and Substructure Design Loads

The installation of the rubber seal lock joints in the system is of particular importance. They must be properly stretched, because axial loads are transferred only through stretched lock joints. The caisson nozzle at tie-in 2 and the guide in the vertical section near the unit fix the pipe on either side. If the lock joints show clearance after installation, that clearance has to be absorbed somewhere during hydrotest. The elbows towards the unit (the pipe immediately adjacent to each elbow) would then most probably be overloaded by excessive deflection.

CAESAR II model of the GRE seawater header showing the 100 kN and 200 kN unbalanced surge loads and elbows 1 to 4.

The support load at the existing axial stop in the straight section towards the unit also needs to be taken into account in the substructure design.

Frequently Asked Question

What happens if an expansion joint in a GRE line is not axially restrained?

The pressure thrust cannot be accommodated by the joint and is transferred to other structural elements. In this header, the thrust components acting on the GRE elbows between the 700 mm expansion joint and elbow 3 then had to be accommodated by pipe bending, and the bending stresses exceeded the allowable limits. Tie-rods, attached to the joint flanges with nuts on both sides, were therefore required.

As occasional load cases. Unbalanced loads of 100 kN and 200 kN from a surge analysis performed by others were applied at elbows 1 to 4 in four combinations, F1 to F4, each loading a pair of elbows. Each combination was run with weight, design pressure and either the hot or the cold design temperature, giving eight of the fourteen load cases.

In this analysis, the external axial force and bending moment on each flange were converted into an equivalent internal pressure, p_eq = 4F_axial/(πD²) + 16M_bending/(πD³). D was set equal to the pipe inner diameter, and a compressive axial force was taken as zero. The equivalent pressure was added to the line pressure and compared with twice the line pressure rating multiplied by a safety factor: 0.67 for sustained, 0.83 for operational, and 0.89 for occasional and hydrotest load cases.

Two were made: tie-rods at the expansion joint to accommodate the pressure thrust, and an axial stop added in the DN600 pipe between tie-in 1 and tie-in 2. With both implemented, the GRE pipe stresses and all GRE flange loads are within the allowable values.

The existing axial stop in the straight section towards the unit is subject to a large axial load from the 200 kN unbalanced load. The collars planned on the pipe can accommodate this load, but the sketched steel substructure appears to be undersized. As the pipe runs in a trench, the recommendation is to connect the stop and guide function to the side wall of the trench, and the support load needs to be taken into account in the substructure design.

Axial loads are transferred only through stretched lock joints. If the joints show clearance after installation, that clearance has to be absorbed somewhere during hydrotest, and the elbows towards the unit would most probably be overloaded by excessive deflection.