Firewater System Upgrade on Two Bridge-Connected Offshore Platforms
As part of an offshore field development, the firewater networks on two bridge-connected platforms, referred to here as Platform A and Platform B, were upgraded. New glass-reinforced epoxy (GRE) piping was installed on both platforms and on the connecting bridge, with short new 90/10 copper-nickel (Cu-Ni) sections connecting it to hydrants and monitors. Parts of the existing Cu-Ni network were retained. Each platform has a single deluge area fed by a deluge valve and a remotely operated valve (ROV), supplemented by hydrants and monitors. Most pumps sit on other platforms linked by bridges. Platform A shares a fire section with a third platform, Platform C, and the deluge nozzles on Platforms A and C open simultaneously.
The engineering question was whether stresses in the new GRE piping were within the code allowables. The Cu-Ni piping was included in the model so that the model was correct. Its results were also reported, and modifications were proposed where its stresses exceeded a fitness-for-purpose limit. This required three linked assessments: a static stress analysis for weight, pressure, temperature, wind and a 100 mm axial bridge movement; a surge analysis for the pressure transients produced by valve and pump actions and by the filling of the dry deluge piping; and a dynamic stress analysis driven by the unbalanced loads those transients create.
Why Fast Deluge Valve Opening Caused Column Separation
The problem arose from the opening time of the valves relative to the start-up time of the pumps. The deluge valves on Platforms A and B had an opening time of 6 seconds. The main firewater pumps were assumed to need 16 seconds to go from zero to full speed. In the interval between valve opening and the pumps reaching capacity, effectively only a 60 m³/h jockey pump feeds the network. At the same moment, the deluge area is still dry, so it presents low flow resistance until water reaches the nozzles. Low pump capacity combined with low resistance drives the pressure down to close to ambient, and below ambient in pipes at high elevation.
Where pressure falls to the fluid vapour pressure, the water column separates and cavities form. When the main pumps then spin up and pressure recovers, those cavities collapse. The collapse generates pressure waves that travel through the network. These produce unbalanced loads wherever the pressure at two adjacent elbows, or at an elbow and a tee, differs.
In the valve-opening scenarios on Platform B, cavitation occurred on Platform A in the 4-inch and 3-inch Cu-Ni lines to the helideck. The helideck is about 9 m above the main ring. In these scenarios the pressures remained below acceptable values. Without support modifications, however, the unbalanced loads from cavity collapse produced computed dynamic stresses as high as 400% of the occasional stress allowable.
Coupled Surge and Stress Modelling to ISO 14692 and ASME B31.3
The existing CAESAR II stress models already contained both the GRE and the Cu-Ni piping. Rather than rebuilding from isometrics, these models were combined and used as the basis for the static and dynamic stress assessments. GRE piping was evaluated against ISO 14692 and the metal piping against ASME B31.3. Material data for the GRE came from the relevant pipe-system catalogue at a 60°C design temperature.
The design pressure was 16 barg. The GRE pressure class is 25 barg for the larger bore piping and higher for small bore. On that basis the piping was taken as vacuum resistant, and sub-atmospheric pressure was not treated as a load case.
The transient behaviour was modelled in BOSfluids, a package for steady-state and transient pipeline analysis. The surge model included the three-dimensional piping, pumps, valves, orifices, hydrants, monitors and deluge nozzles. Surge waves run over long distances and reach neighbouring platforms connected by pipe bridges. The model therefore also incorporated the main flow components on Platform C and on a further platform carrying firewater pumps, although those platforms fell outside the scope.
Filling of the initially dry deluge area was modelled with a segmented method. The simulation time is divided into intervals, and each interval has its own model with a zero-pressure boundary at the current waterfront position. This captures the flow velocity at each elbow as the system fills.
Where vendor data was incomplete, assumptions were made and recorded, including typical valve opening characteristics and a 16-second pump start-up. Platform C and the further pump platform were modelled only crudely. The results are therefore non-conservative if pressure waves originating there are larger than those generated on Platforms A and B.
The assessment covered ten scenarios, six on Platform B and four on Platform A. Eight were valve openings. One was a closure of the deluge valve and ROV on Platform B. One was the sequential opening of all three monitors and eight hydrants on Platform A after its deluge valve and ROV had opened. In every Platform A scenario, the four deluge valves on Platform C opened at the same time. Filling of the deluge area was analysed for three of the valve openings.

Valve Opening Time, Branch Isolation and Support Modifications
Three modifications were specified. For the loads from valve opening, removing the cause of the low pressures was preferred to adding axial stops at a large number of positions, which would require additional supporting steel structures.
The opening time of the deluge valve and ROV on Platform A, and of the four deluge valves on Platform C, was to be increased to at least 16 seconds, measured from fully closed to the final opened position. The deluge valve and ROV on Platform B kept their 6-second opening time. With a 16-second opening time, a minimum system pressure was maintained until the main pumps took effect. This resolved the high stresses and flange loads that column separation had caused with the original opening times.
Air valves were considered as an alternative but not preferred. They only mitigate the low pressure, and the system would be less reliable. Adding as few components as possible also keeps the system simple. This option was not investigated in detail.
The helideck branch on Platform A remained connected to the main ring and pressurised up to closed valves just upstream of two foam stations. It was to be shut off with a spectacle blind or equivalent at a low point in the 4-inch line.
Finally, axial stop or guide functionality was specified at a number of supports. For the GRE, support modifications were specified until all stresses fell below the allowable. The Cu-Ni allowable stress was conservatively taken as 58 MPa for all sizes. For the Cu-Ni piping, a fitness-for-purpose limit of 130% of the occasional allowable was applied, on the basis that the existing lines had been in service for about 15 years. Changes were proposed only where stresses exceeded that limit.
GRE and Cu-Ni Stress Results for Surge, Closure and Filling Cases
With the helideck branch shut off and the support modifications applied, all GRE stresses in the Platform B valve-opening scenarios fell below the occasional allowable. All Cu-Ni stresses fell within the 130% fitness-for-purpose limit. The maximum cavity size in these scenarios was about 3%, a fraction that does not cause large pressure peaks.
Some cavitation remained. In the ROV-only opening on Platform A, with the 16-second opening time, the cavity size reached 11.6% during filling. This occurred just upstream of a hydrant on Platform B, at one of the highest points in the system. The piping could accommodate the resulting unbalanced loads.
In the sequential opening of monitors and hydrants, all GRE stresses were below the allowable. Cu-Ni stresses exceeded the allowable at several points. These lines and their hydrants and monitors are existing, and they were considered fit for purpose. The valve-closure scenario on Platform B produced moderate loads. The highest GRE stress was 78% of the occasional allowable and no modifications were required, so closure was not analysed again for Platform A.
GRE flange loads were assessed as total equivalent pressures. No allowable is available for these flanges, and the computed values were considered moderate for a pipe class of 25 barg and higher.
The filling analyses on Platform B were run without modifications. They showed that waterfront impacts were relatively mild, with the highest GRE stress at 81% of the allowable in both filling cases. The relatively high 5 mm wall thickness of all small-bore GRE pipes contributes to this result. The highest computed waterfront velocity was 14.6 m/s, at a 4-inch elbow in the ROV-only filling. A dynamic load factor of 2 was applied to the waterfront loads, the highest value considered realistic as resonance was not expected. A factor of 1 was used on straight pipe running from a tee to a dead end. Filling velocities on Platform A were low. By comparison with Platform B, the deluge-area stresses there were concluded to meet the allowables.
One condition was accepted. An ROV-only operation on Platform B produced a 10.2 m/s steady-state velocity in about 3 m of 6-inch piping upstream and downstream of the ROV. This 6-inch line is undersized to feed the complete deluge area. Operation through both valves avoids this velocity and is preferred. Because ROV-only operation is not expected to occur often, the high velocity was not considered a serious issue.

Valve Timing and Cross-Platform Surge in Dry Deluge Systems
The static analysis required no GRE modification; every support change traced back to the dynamic analysis. In this system, a 6-second deluge valve opening against a 16-second pump start-up led to the low pressures, the cavitation and the loads from cavity collapse. The start of firewater flow through the deluge nozzles depends on the main pump start-up, and fast valve opening hardly affects it.
Lengthening the opening time of the valves on Platforms A and C to at least 16 seconds addressed that cause directly. It also avoided adding axial stops at a large number of positions or air valves at several locations. In the Platform B valve-opening scenarios, the 6-second opening time was retained. There, the stresses were brought within the limits by shutting off the helideck branch on Platform A and modifying supports.
The network was modelled as a connected whole because surge waves reach neighbouring platforms through the pipe bridges. Valve openings on Platform B caused cavitation in the helideck branch on Platform A. The ROV-only opening on Platform A caused cavitation near a hydrant on Platform B.

Frequently Asked Questions
Why does fast deluge valve opening cause column separation in a firewater system?
In this system the deluge valves opened in 6 seconds, while the main firewater pumps were assumed to need 16 seconds to reach full speed. Until then, effectively only a 60 m³/h jockey pump fed the network, and the dry deluge area offered low flow resistance. The pressure fell close to ambient, and below ambient in pipes at high elevation. Where it reached the vapour pressure, the water column separated. When the pumps spun up, the cavities collapsed and sent pressure waves through the network, producing unbalanced loads between adjacent elbows and tees.
What deluge valve opening time prevents high stresses from column separation when firewater pumps take 16 seconds to start?
An opening time of at least 16 seconds, measured from fully closed to the final opened position, was specified for the deluge valve and ROV on Platform A and for the four deluge valves on Platform C. With this opening time, a minimum system pressure was maintained until the main pumps took effect. This resolved the high stresses and flange loads that column separation had caused. Some cavitation remained, reaching 11.6% in the ROV-only opening, but the piping could accommodate the resulting unbalanced loads.
How high were the dynamic stresses from cavity collapse before support modifications?
In the valve-opening scenarios on Platform B, the unbalanced loads from cavity collapse produced computed dynamic stresses as high as 400% of the occasional stress allowable. Pressures in these scenarios remained below acceptable values. The static analysis required no GRE modification; every support change traced back to the dynamic analysis.
What dynamic load factor is used for waterfront impact loads when filling a dry deluge system?
A dynamic load factor of 2 was applied to the waterfront loads. This was the highest value considered realistic, as resonance was not expected. A factor of 1 was used on straight pipe running from a tee to a dead end. With these loads and no modifications, the highest GRE stress was 81% of the allowable in both filling cases on Platform B, and the highest computed waterfront velocity was 14.6 m/s at a 4-inch elbow.
How was the existing Cu-Ni firewater piping assessed alongside the new GRE?
The Cu-Ni piping was assessed to ASME B31.3 with a conservative allowable stress of 58 MPa for all sizes. A fitness-for-purpose limit of 130% of the occasional allowable was applied, on the basis that the existing lines had been in service for about 15 years. Changes were proposed only where stresses exceeded that limit.
Why include neighbouring platforms in a firewater surge model?
Surge waves run over long distances and reach neighbouring platforms through pipe bridges. Valve openings on Platform B caused cavitation in the helideck branch on Platform A, and the ROV-only opening on Platform A caused cavitation near a hydrant on Platform B. The main flow components on the adjacent platforms were therefore included. These platforms were modelled only crudely, so the results are non-conservative if pressure waves originating there are larger than those generated on the platforms in scope.