Fatigue and Flexibility Assessment of Interconnecting Gas Piping on an Offshore Platform Bridge

ON THIS PAGE

Gas Piping Between Independently Supported Offshore Structures

This project assessed the piping that carries gas between an oil production platform and a jack-up platform. The platforms are approximately 100 m apart, and the interconnecting piping, a 42-inch low-pressure line and a 20-inch high-pressure line, is supported from a slender bridge structure between them.

The production platform, the jack-up and the bridge are each supported independently from the local sea bottom, with no rigid connection between them, so they move independently when loaded by waves, wind and current. The piping has at least one fixed point on each structure and must accommodate their relative movement. Wave loads cause oscillating movements and make the main contribution to a possible fatigue problem. Wind and current were taken to cause static movements only and were considered not to contribute to fatigue; wind loads on the piping were assessed separately in the static load cases.

At a significant wave height (Hs) of 6.5 m and a wave period (Tp) of 12.5 s, the maximum jack-up displacements are in the order of 40 cm and the maximum bridge displacements in the order of 1.3 cm. No detailed wave response amplitudes were available for the production platform; its ultimate displacement of 20 cm in either direction was conservatively treated as wholly dynamic. An ultimate jack-up displacement of 1.3 m, for a survival case of a once-in-50-year event, was kept out of the fatigue assessment and checked separately.

The assessment had to show whether the piping could accommodate the repeated movement over a 20-year operating period within the ASME B31.3 fatigue allowable, and whether the 1.3 m displacement would stay within the code limit.

Quasi-Static Fatigue Approach and Bridge-Piping Modal Comparison

The bridge and jack-up oscillation frequencies are low compared with the natural frequencies of the piping, so piping dynamics does not play a role. For the bridge, this was checked by comparing the mode shapes and natural frequencies of the bridge structure and the piping, with the piping considered disconnected from the bridge. The bridge torsion, surge and sway modes are at 0.377, 0.48 and 0.51 Hz; the lowest piping frequencies with a similar mode shape are 1.495, 1.79 and 1.67 Hz respectively.

With the frequencies far apart, resonance of the bridge piping due to bridge movement is not likely, and at the low bridge frequencies the supported piping moves quasi-statically with the bridge. The fatigue assessment was therefore based on a quasi-static approach: the calculated structural movements were converted into piping deflections, which were used as input to a flexibility analysis.

Bridge structure torsion mode shape at 0.377 Hz beside the lowest similar piping mode shape at 1.495 Hz, offshore gas piping model.
Bridge torsion mode at 0.377 Hz (left) and the lowest piping mode with a similar shape at 1.495 Hz (right), with the piping modelled disconnected from the bridge.

CAESAR II Flexibility Model and ASME B31.3 Fatigue Method

The piping was modelled in CAESAR II from marked-up isometrics. The 42-inch and 20-inch lines each have three main fixed points, on the bridge and on each platform, which allow the analysis to be split into two parts: one mainly influenced by the differential movement between the jack-up and the bridge, the other by that between the production platform and the bridge.

Fatigue was assessed to paragraph 302.3.5 of ASME B31.3, which compares the expansion stress range, which covers imposed displacements such as the platform movement, with an allowable stress range reduced by the factor f = 6N^-0.2 for more than the standard 7,000 cycles.

The phase difference between the structures cannot be predicted for each sea state, so they were conservatively assumed always to oscillate in exactly opposite directions, and the piping was taken to accommodate the sum of the two displacement amplitudes.

Calculating stress ranges at every node for each sea state was avoided by considering two wave headings, axial and lateral to the bridge, and assuming that stresses vary linearly with platform displacement. For each heading on the jack-up and production platform sides of the bridge piping, the stress range was calculated at an intermediate and a maximum differential displacement, eight stress range cases in all. The stress range for each sea state was obtained from these by interpolation and extrapolation. The fatigue check was performed only at the highest-stressed node, as all other locations have a longer fatigue life.

The damage from the axial and the lateral heading, each applied for 100% of the time, was added. This gives the assessed sea states a cumulative probability of 2 against 1 in reality, which overestimates the number of stress cycles and avoids including the variation in wave heading in the analysis.

Expansion Loops, Wall Thickness Changes and Flange Ratings

The movement of the platforms and bridge requires flexibility in the piping, which is provided by expansion loops. Ovalisation of the loop bends supplies most of the added flexibility, and the resulting wall bending stress is represented by a stress intensification factor. Larger-radius bends generally have lower stress intensification factors than smaller-radius bends but give less flexibility, and 3D bends were chosen for the loops as the best compromise between stress and flexibility.

A number of sections have a varying wall thickness, which keeps the deformation from the platform displacements within the expansion loops. Without it, the piping near the jack-up would not meet the fatigue life requirement. The thicker pipe is to be tapered to minimise discontinuity stresses at the change in wall thickness.

The bending moments from the structural displacements caused a number of flanges to be overloaded, and higher pressure-rated flanges were introduced to allow for them.

Stress, Fatigue and Scrubber Nozzle Load Results

The primary stresses are within the ASME B31.3 allowable values. These come from pressure and weight in the sustained load case, with wind added in the four occasional load cases. The flange loads are within their allowables.

The fatigue assessment covered sea states up to an Hs of 6.5 m. The differential axial and lateral displacement cycles between the production platform and the bridge consume hardly any fatigue life. Those between the bridge and the jack-up consume 20% of the allowable fatigue life over the 20-year operating period, against a limit of 100%.

For the ultimate jack-up displacement, a displacement cycle with an amplitude of 1.3 m, the maximum displacement stress is about 95% of the ASME B31.3 allowable displacement stress, which was considered acceptable.

At the inlet nozzle of the scrubber vessel on the jack-up, the vertical force is 44,214 N against an allowable of 29,300 N, while the other five load components are below their allowables. A separate assessment of the nozzle showed 83% margin in the nozzle stresses with the allowable loads applied. Whether this combination of loads is acceptable remains for the vessel manufacturer to confirm.

Deformed shapes of offshore bridge gas piping at the jack-up end, showing differential shortening and elongation under axial wave heading.
Model of the bridge piping at the jack-up end, deformation exaggerated: differential shortening (left) and elongation (right) at the two ends of half an oscillation cycle, waves in the axial direction.

Lessons for Displacement-Driven Fatigue in Offshore Bridge Piping

With piping connecting three structures supported independently from the sea bottom, the wave-induced differential displacement made the main contribution to a possible fatigue problem, and the assessment was built around those structural movements. The quasi-static treatment rested on the bridge and jack-up frequencies being low compared with the piping natural frequencies, and for the bridge this was confirmed by a modal comparison.

Two simplifications reduced the CAESAR II fatigue stress calculations to eight stress range cases: two wave headings, axial and lateral to the bridge, and linear scaling of stress with displacement. Three assumptions are conservative: opposite-phase oscillation, the maximum fatigue damage at the same location for all sea states, and both wave headings applied for 100% of the time.

Expansion loops with 3D bends took up the deformation, and the varying wall thickness kept it in the loops; without the varying wall thickness, the piping near the jack-up would not have met the fatigue life requirement. A single nozzle load component above its allowable was assessed against the stress margin in the nozzle itself, with acceptance of the combination left to the vessel manufacturer.

Bridge structure sway mode shape at 0.51 Hz beside the lowest similar piping mode shape at 1.67 Hz, with expansion loops visible.
Bridge sway mode at 0.51 Hz (left) and the lowest piping mode with a similar shape at 1.67 Hz (right).

Frequently Asked Questions

When can a quasi-static approach be used for fatigue of piping on an offshore platform bridge?

Here the bridge and jack-up oscillation frequencies are low compared with the natural frequencies of the piping, so piping dynamics does not play a role. A modal comparison confirmed this for the bridge, with the piping considered disconnected from it. The bridge torsion, surge and sway modes are at 0.377, 0.48 and 0.51 Hz; the lowest piping modes with a similar shape are at 1.495, 1.79 and 1.67 Hz. With the frequencies far apart, resonance of the bridge piping due to bridge movement is not likely.

The paragraph compares the expansion stress range, which covers imposed displacements such as platform movement, with an allowable stress range. That allowable is reduced by the factor f = 6N^-0.2 for more than the standard 7,000 cycles. Stress ranges came from eight CAESAR II cases and were interpolated for each sea state. The check was made at the highest-stressed node, since all other locations have a longer fatigue life.

Each line has three main fixed points, on the bridge and on each platform, which split the model into a jack-up side and a production platform side. The structures were conservatively assumed to oscillate in exactly opposite directions, so the piping takes the sum of the two displacement amplitudes. For the axial and lateral wave headings on each side, stress ranges were calculated at an intermediate and a maximum differential displacement, giving eight stress range cases.

Cycles between the production platform and the bridge consume hardly any fatigue life. Cycles between the bridge and the jack-up consume 20% of the allowable fatigue life over the 20-year operating period, against a limit of 100%. The assessment covered sea states up to a significant wave height of 6.5 m.

Yes. This survival case, a once-in-50-year event, was kept out of the fatigue assessment and checked separately. For a displacement cycle with an amplitude of 1.3 m, the maximum displacement stress is about 95% of the ASME B31.3 allowable displacement stress, which was considered acceptable.

Ovalisation of the loop bends supplies most of the added flexibility. Larger-radius bends have lower stress intensification factors but give less flexibility, and 3D bends were the best compromise between the two. Sections of varying wall thickness keep the deformation within the loops; without them the piping near the jack-up would not meet the fatigue life requirement. The thicker pipe is to be tapered to minimise discontinuity stresses.

At the scrubber inlet nozzle, the vertical force is 44,214 N against an allowable of 29,300 N, while the other five components are below their allowables. A separate nozzle assessment showed 83% margin in the nozzle stresses with the allowable loads applied. Whether the combination is acceptable remains for the vessel manufacturer to confirm.