Shared Seawater Intake for an LNG Terminal and a CCGT Plant
The IONIO project comprises a new LNG regasification terminal in an industrial area that also hosts the ERG power station, a combined-cycle gas turbine (CCGT) plant. Both facilities need seawater. The terminal uses it to vaporise LNG, while the power station uses it as a cooling medium, mainly for its two condensers. The design uses the existing seawater intake facilities, for filtration and pumping, to supply both plants. From tie-ins on the supply lines to ERG, a dedicated line carries seawater to the terminal booster pumps, and after passing through the vaporisers the seawater returns to the main lines to the power station.
This arrangement has a process advantage. Because vaporising LNG cools the water, the return stream is colder, which benefits the power plant condensers. It also means the two seawater systems are directly connected, and the review concluded that the power plant seawater system should be considered an integral part of the terminal seawater system.
The review examined the existing ERG seawater system and the current plans for the terminal seawater lines to identify potential risks for the LNG terminal.
Booster Pump Suction Pressure on the 80" GRP Header
The main design issue the review identified in the power plant seawater system was its low operating pressure. Six of the 13 existing seawater pumps were refurbished for the new power plant requirements, five operating and one spare, each delivering 7200 m³/h at a discharge working head of 17.5 mLC. This corresponds to an operating pressure of 1.75 barg at the pump discharge flange, 1.1 m above sea level; the location at which the discharge pressure is specified was still to be reconfirmed.
Seawater travels to the power station through two parallel 72″ glass reinforced polyester (GRP) lines. The terminal draws from both 72″ lines through one 80″ GRP header connected to seven booster pumps, designated P-511 A to G, each with a flow of 3900 m³/h and a head of 73 mLC. Six of these run with one on standby in the first phase.
The calculated steady-state pressure at the booster pump suction is between 0.29 and 0.45 barg. The 1.75 barg starting pressure is reduced by friction loss in the pipe and bends and by a 4.7 m elevation difference, as the booster pumps sit 5.8 m above sea level against the 1.1 m discharge flange. At some of the bridges along the 80″ line the steady-state pressure is 0.21 barg. Preliminary calculations indicate that the absolute line pressure stays above atmospheric during steady state.
With the suction pressure well below 1 barg, pressure variations caused, for example, by opening or closing a valve, or by starting or stopping an additional pump, may result in a pressure drop below atmospheric. Sub-atmospheric pressure might result in vaporisation of dissolved gas in the seawater, and it places stronger requirements on the GRP pipe. It was unclear whether the GRP pipe is vacuum resistant.
Pressure Drop, Integral Surge and Stress Studies
A pump failure or a rapid valve closure in the power plant is very likely to result in pressure waves that also travel through and affect the connected terminal system. The review therefore recommended that the surge analysis model the two seawater systems together as one.
The review strongly recommended three studies. A steady-state pressure drop calculation is required to verify the pressure level along the system during normal operating conditions. An integral surge analysis is required to analyse failures and other upset conditions; at these diameters the unbalanced forces that might occur during a failure are significant, and the system should be checked for them. A subsequent stress analysis should check the fitting capability and layout at the tie-ins and the end header, where relatively high stresses may result in the fittings when the system is filled and at temperature and pressure.
GRP Pipe Qualification and the Terminal Weir Box
GRP piping details required for the analysis were to come from the pipe supplier, and the review set out questions on pipe capability. These cover the pressure rating and the allowable short-term overpressure, full vacuum resistance, whether the pipe and joints are fully tensile resistant, the recommended support span for 72″ and 80″ pipe, the recommended burial depth at road crossings, and the stiffness factor S for the elastic stability analysis of buried sections.
The long-term material properties quoted by the supplier range from 10 to 60 MPa in the hoop direction and 10 to 20 MPa in the axial direction. The review asked which long-term values should be used and what they are based on. It also asked which products in the supplier’s range have been qualified by bi-axial 1000-hour tests, and required third-party background documentation to DEP where they have. The review states that demonstrating the fitness for purpose of the GRP components by medium-term qualification tests is of major importance.
The latest proposed design places a weir box at the end of the terminal seawater system, immediately before the line is fed back into the main system. When the booster pumps carry more flow than the seawater pumps, the weir box overflows to prevent circulating flow. This removes the need for automatic pressure control valves; the review describes automatic valves as a source of problems at the 72″ line size, to be avoided wherever possible. The review recommended that the weir box be carefully checked for vibration and for the effective backpressure it creates. On the Seraya II project, an above-ground GRP seawater system of about the same diameter and pressure rating, the backpressure tower at the weir box vibrated heavily due to two-phase flow downstream of flow control valves.

Potential Issues in the Two GRP Seawater Systems
The review documented nine potential issues for the ERG seawater system and eleven for the terminal seawater system. Besides the low operating pressure, these include the risk of pipe upheaval from buoyancy where burial is shallow or the pipe is only partly buried. The review describes this risk as large in case of a high water table and an empty pipe. Where the pipe is partly buried, discontinuity stresses at the transition from underground to above-ground pipe need attention. At some road crossings the design places the pipe at shallow depth immediately below the road, which the review states is not acceptable for GRP. It was unclear whether and how the pipe is protected from traffic loads.
If stresses at the tie-ins prove high, the review recommended a layout with more flexibility for expansion due to temperature and pressure. For the end header it advised considering a different layout with more room for expansion, if required. Above-ground pipe requires specific supporting, and the review notes that the forces involved should not be underestimated; on Seraya II, a support on the above-ground GRP pipe failed.

Booster Pump Location, Header Routing and Uncoupling Option
Among the review’s main concerns for the terminal were the booster pump location and the routing of the 80″ header. The booster pumps sit relatively far from the tie-in with the main system, so friction losses reduce their suction pressure. They also sit at a relatively high point, 5.8 m above sea level, and the review states that a lower location would be better, if possible, to increase the suction pressure. Where the header crosses bridges, the local high points might result in air traps and local vacuum conditions, and air traps may increase the local pressure drop. A straighter route would be more favourable.
The review also highly recommended studying again the possibility of uncoupling the two systems upstream of the vaporisers. Two dedicated, heavier seawater pumps for the terminal, for example, would increase the steady-state pressure, make the booster pumps obsolete and, with the two systems uncoupled, reduce the possibility of a failure. Downstream of the vaporisers, the colder seawater could still be returned to the power plant system.
Frequently Asked Questions
Why is low booster pump suction pressure a risk on a GRP seawater header?
The calculated steady-state suction pressure at the booster pumps was 0.29 to 0.45 barg, well below 1 barg. At that level, pressure variations caused by opening or closing a valve, or by starting or stopping an additional pump, may drop the pressure below atmospheric. Sub-atmospheric pressure might result in vaporisation of dissolved gas in the seawater and places stronger requirements on the GRP pipe. It was unclear whether the GRP pipe is vacuum resistant.
Should a surge analysis model the power plant and LNG terminal seawater systems together?
For this shared system, the review recommended an integral surge analysis with both seawater systems in one model. A pump failure or a rapid valve closure in the power plant is very likely to result in pressure waves that also travel through and affect the connected terminal system. At these diameters, the unbalanced forces that might occur during a failure are significant.
Which studies did the review recommend for the shared seawater system?
Three, all strongly recommended. The first is a steady-state pressure drop calculation to verify the pressure level along the system during normal operating conditions. The second is an integral surge analysis of failures and other upset conditions. The third is a subsequent stress analysis of the fitting capability and layout at the tie-ins and the end header, where relatively high stresses may result in the fittings when the system is filled and at temperature and pressure.
What should a GRP pipe supplier confirm for 72" and 80" seawater lines?
The review asked the supplier to confirm:
- the pressure rating and allowable short-term overpressure
- full vacuum resistance
- whether the pipe and joints are fully tensile resistant
- the recommended support span for 72″ and 80″ pipe
- the recommended burial depth at road crossings
- the stiffness factor S for the elastic stability analysis of buried sections.
It also asked which long-term values apply, given long-term properties quoted by the supplier of 10 to 60 MPa in the hoop direction and 10 to 20 MPa in the axial direction. Finally, it asked which products have been qualified by bi-axial 1000-hour tests, with third-party background documentation to DEP.
Why use a weir box instead of automatic valves at the end of the terminal seawater line?
The weir box overflows when the booster pumps carry more flow than the seawater pumps, which prevents circulating flow without automatic pressure control valves. The review describes automatic valves as a source of problems at the 72″ line size, to be avoided wherever possible. It also recommended that the weir box be carefully checked for vibration and effective backpressure. On another GRP seawater system of about the same diameter and pressure rating, the backpressure tower at the weir box vibrated heavily due to two-phase flow downstream of flow control valves.
What burial risks apply to GRP seawater pipe at road crossings?
Where the design places the pipe at shallow depth immediately below a road, the review stated this is not acceptable for GRP. It was also unclear whether and how the pipe is protected from traffic loads. Shallow or partial burial also brings a risk of pipe upheaval from buoyancy, which the review describes as large in case of a high water table and an empty pipe. Where the pipe is partly buried, discontinuity stresses at the transition from underground to above-ground pipe need attention.
How could the terminal seawater supply be uncoupled from the power plant?
The review highly recommended studying again the possibility of uncoupling the two systems upstream of the vaporisers. Two dedicated, heavier seawater pumps for the terminal, for example, would increase the steady-state pressure, make the booster pumps obsolete and reduce the possibility of a failure. Downstream of the vaporisers, the colder seawater could still be returned to the power plant system.