GRE Firewater Ring Main Surge Analysis and Air Valve Protection

ON THIS PAGE

Firewater ring main and surge analysis scope

A firewater system was specified for a new platform, to be connected to the firewater systems of the two existing platforms it extends. The system is a wet ring main: permanently water filled and held under pressure by a jockey pump on one of the existing platforms. Built from glass-reinforced epoxy (GRE) pipe, Ameron Bondstrand Filament-Wound Epoxy Series 7000-M-225, with a 6-inch ring main and 4-inch branches, it feeds monitors and hydrants across three decks. The study covered the new platform alone, with the jockey pump represented only through an initial pressure boundary condition of 75 psig.

The analysis compared the maximum pressures during upset scenarios with the pipe capabilities and calculated the unbalanced forces for use as occasional loads in a pipe stress analysis. The acceptance limit was the occasional allowable pressure of 337.5 psig specified by the client, against a maximum design pressure of 225 psig for the GRE pipe. A large number of scenarios were built from three upset events: opening or closing a monitor, opening or closing a hydrant, and starting or stopping the firewater pump. In the initial design, the calculated pressures were well above the 337.5 psig limit. The study reported the seven start-up and ten shutdown scenarios that produced the highest pressures or unbalanced forces with the recommended air valves in place.

Cavitation pocket implosion at the cooler deck high points

The pressure peaks were caused by the implosion of cavitation pockets formed during drainage. When a monitor or hydrant opens at the cellar deck, the system begins to drain before the main pump has started. The pump is started on a low-pressure signal and can start up to 35 seconds after the signal is received, so the system has time to drain. As the water drains, cavitation pockets of water vapour form at all high points in the system, which include all of the cooler deck hydrants and the bridge that houses two isolation valves.

Once the pump delivers water, the cavitation pockets implode in sequence as the advancing water fronts meet. The magnitude of each peak follows from the Joukowsky relation, Δp = a·ρ·ΔV, where a is the wave speed in the pipe, ρ the fluid density and ΔV the change in velocity; for a pocket at a closed end, ΔV equals the flow velocity at the moment the water fronts meet. The pockets at hydrants HS9 and HS11 fill first because they are relatively small and closest to the pump. The pocket at the isolation valves fills at a higher flow rate, but the larger pipe diameter and the additional flow path towards HS10 give a smaller change in velocity than at HS9 and HS11. The pocket at HS10 fills last, at the highest flow rate, because no other cavitation pocket still draws flow.

For the most critical scenario, with monitor FM1 and hydrant HS4 opened at the cellar deck and a 35-second delay to pump start-up, the initial design produced peaks of 500 and 750 psig at two of the cooler deck hydrants (HS9 and HS11), 300 psig at the isolation valves and 1200 psig at HS10, against an occasional allowable of 337.5 psig. The HS10 implosion created unbalanced forces of around 16,000 lbf.

BOSfluids transient model of the platform firewater piping

A model of the complete firewater piping system was built in the transient software BOSfluids, with geometry taken from a CAESAR II model and, for the piping near the pump, from the project drawings. The fluid was chlorinated seawater, and the model included the pressure control, pressure relief and air release valves on the pump discharge, the isolation valves, and the seven-stage diesel-driven main pump with its combined pump and motor inertia.

The BOSfluids large cavity module described the amount of drainage and where cavities formed, but it cannot capture the maximum pressure surges. The refill was then computed with the Concentrated Air Pocket (CAP) module, which gives a good representation of the maximum pressure surges. All of the models used the FM1 and HS4 scenario, which the study identified as the most critical: the 35-second delay allows the system to drain to a significant extent. A pump start 2 seconds after the signal, instead of 35 seconds, reduced the peaks by around 20 percent, consistent with the late start being the critical case. The 1200 psig peak at HS10 was verified with a separate model that approximates the system as quasi-static at the moment of implosion; its pressure peaks corresponded well with those of the CAP model.

Air valve sizing and placement on the cooler deck bridge

In consultation with the client, the study recommended two air valves at the highest point of the 6-inch line on the cooler deck, within the bridge containing the isolation valves, each between an elbow and the adjacent isolation valve. Each valve has an inlet orifice diameter of approximately 1 inch and an outlet orifice diameter of approximately 0.1 inch. The study calculated that the cooler deck piping drains at about 1 ft³/s, so each valve is sized to admit 1 ft³/s of air into the system to prevent cavitation. The small outlet restricts the air leaving the system, so the retained air acts as a cushion that reduces the pressure wave created by the impact of the water after the pump has started. The size of the air valve itself is not prescribed; procurement should take into account that the valves are exposed to seawater, which has high salinity.

3D model of a 6-inch GRE firewater bridge line with two isolation valves and two air valves at the high point.
Two air valves modelled at the high point of the 6-inch cooler deck bridge, one between each elbow and the adjacent isolation valve.

Two valves are required so that at least one remains connected to the firewater system when a section of it is isolated. The reported scenarios include cases with one valve isolated, so the results also verify the sizing.

Start-up and shutdown surge results with air valves

With the air valves included, the maximum pressures in all seven reported start-up scenarios and all ten reported shutdown scenarios were within the occasional allowable of 337.5 psig. Start-up peak pressures ranged from 162 to 195 psig and occurred at the pump outlet in all but one scenario; the highest, 195 psig, was in scenario Cooler Deck 1. Shutdown peaks reached no more than 222 psig, at the pump outlet, in the scenario that closes hydrant HS10 at the cooler deck before the pump is shut down. The largest unbalanced force in the reported scenarios was 725 lbf, in start-up scenario Cellar Deck 2 on the main deck piping.

Location or scenario setInitial design peak (psig)With air valves (psig)Occasional allowable (psig)
HS9 and HS11500 and 750, one peak at eachn/a337.5
Isolation valves300n/a337.5
HS101200n/a337.5
Start-up scenarios (7)n/a162 to 195337.5
Shutdown scenarios (10)n/aup to 222337.5

In that scenario, the maximum unbalanced force resulted from the rapid pressure drop as monitor FM1 opened. The refill after drainage caused no pressure surges because of the small outlet orifice, and the air valves closed again at a relatively low flow velocity without significant pressure spikes.

Calculated cavity size along the cooler deck piping just before pump start-up in the initial design without air valves; cavities form at the hydrant branches and the isolation valve bridge.

Manual calculations showed that trapped air passing elbows produces unbalanced forces no greater than 300 lbf at a flow velocity of 7 m/s. The unbalanced-force time histories for all pipe elements were delivered per scenario for use as occasional loads in a CAESAR II stress analysis, which was outside the scope of this study.

Design and modelling notes for a draining firewater main

In the most critical initial-design scenario, the pressure peaks came from cavitation pocket implosion during refill after partial drainage, at the high points of the cooler deck. The air valve arrangement had to follow the isolation arrangement, since a valve isolated from the section it protects offers no protection in that state.

Cavity size contour along GRE firewater piping at the cooler deck before pump start-up, showing cavities at hydrant branches and the isolation valve bridge.
Calculated cavity size along the cooler deck piping just before pump start-up in the initial design without air valves; cavities form at the hydrant branches and the isolation valve bridge.

BOSfluids is a single-phase package, so the air valve model does not track the water/air interface; in the real system, drainage is slower and filling faster than in the air valve model while the air volume is large. Potential cavitation during drainage and unbalanced forces during filling occur when the air volume is small, so the study expects the pressure surges and unbalanced forces to be captured accurately.

Frequently Asked Questions

What causes high surge pressures in a wet firewater ring main at pump start-up?

In this system, opening a monitor or hydrant at the cellar deck let the ring main drain before the pump started, which can take up to 35 seconds after the low-pressure signal. Cavitation pockets formed at the high points of the cooler deck. When the pump refilled the system, the pockets imploded, and each peak follows from the Joukowsky relation, Δp = a·ρ·ΔV.

For the most critical scenario, with monitor FM1 and hydrant HS4 open and a 35-second delay to pump start-up, the peaks were 500 and 750 psig at hydrants HS9 and HS11, 300 psig at the isolation valves and 1200 psig at HS10. The occasional allowable was 337.5 psig. The HS10 implosion created unbalanced forces of around 16,000 lbf.

The large cavity module described how far the system drained and where cavities formed, but it cannot capture the maximum pressure surges. The refill was computed with the Concentrated Air Pocket (CAP) module, which gives a good representation of the maximum surges. A separate quasi-static model verified the 1200 psig peak at HS10.

The inlet is sized to the drainage rate. The study calculated that the cooler deck piping drains at about 1 ft³/s, so each valve admits 1 ft³/s of air, giving an inlet orifice diameter of approximately 1 inch. The outlet orifice, approximately 0.1 inch, restricts the air leaving so that it acts as a cushion against the returning water.

The air valves sit on a bridge that contains isolation valves. Two valves, one between each elbow and the adjacent isolation valve, ensure that at least one stays connected to the firewater system when a section is isolated. The reported scenarios include cases with one valve isolated.

Yes. The maximum pressures in all seven reported start-up scenarios (162 to 195 psig) and all ten reported shutdown scenarios (up to 222 psig) were within the 337.5 psig occasional allowable. The largest unbalanced force was 725 lbf, in start-up scenario Cellar Deck 2.