Caisson Configuration and Client-Specified Loads
A seawater dump caisson is mounted on a deck of an offshore structure. It consists of a 56-inch (ID1400) GRE pipe header, EST series with a 55° winding angle, fixed at the main deck and guided at the upper deck. At the top section, two process nozzles are connected, N1 at 30-inch (ID750) and N2 at 16-inch (ID400), and a coverplate carries a 24-inch vent nozzle. Design pressure is 3.5 barg and the design temperatures are 65 °C and -13 °C. Loads from the piping connected to the nozzles and from environmental conditions such as wind and waves create bending moments in the caisson and at the nozzle/caisson interfaces.
The difficulty was the magnitude of the client-specified loads. Some components were so large that it was hard to see how they could be transferred to the GRE caisson, which would deflect substantially under them. The caisson flexibility appears not to have been modelled when the loads were derived; had it been, some components would most probably have been substantially lower. In addition, the specified loads did not form a consistent set: applied simultaneously, they did not produce an equilibrium state. At the client’s request, the loads were applied as specified.
The scope was to determine the pipe thicknesses, laminate thicknesses and bonding lengths for the top part of the caisson, and the overall header thickness between the guide and the main deck fixation, needed to keep stresses within long-term allowable levels. The analysis also calculated an equivalent pressure for sizing the connection flange and checked the surface pressure at the guide support.
ISO 14692 Allowables and Load Basis
Allowable stresses were based on the pipe supplier’s material data and the rules of ISO 14692. The material data give a lower confidence limit (LCL) of 125 MPa. In the axial direction the allowables were 25 MPa for sustained loads, 30 MPa for operation and 33 MPa for occasional loads; the corresponding hoop allowables were 80, 100 and 110 MPa. From the client documentation, load components were identified as primary or secondary (reduced by deflection of the caisson), and some as occasional, such as wind and wave loads. Platform movements and wind made the largest contribution to the loads: wind loads are occasional but primary, while loads from platform movement are secondary.
The load fractions in earlier client documentation were applied to the latest issue of total loads, and three load cases were defined from them. The sustained case combines weight, pressure, thermal and acceleration loads. The operation case adds displacement loads, and the occasional case adds environmental loads. Because the individual fractions within the combined weight, pressure and thermal loads were not known, that contribution was conservatively treated as fully primary.
The interface locations at which the loads were specified were assumed to act as fixed anchors, because the documentation did not make clear how they behaved when the interface loads were determined. Before the nozzle loads were applied in FE-Pipe, the most conservative load directions were determined: those giving the highest loads at the intersections of the nozzles with the header. Because the specified loads were not in equilibrium, a worst-case load scenario at equilibrium could not be generated for the header between the guide and the main deck. For this part of the header, the highest loads were assumed to occur at the main deck fixation, where the in-plane and out-of-plane bending moments and the axial load make the largest contribution to the total stress.
FE-Pipe Nozzle Model, Header Calculation and Guide Support
The stress analysis was split into two parts. Part A covered the discontinuity stresses near the nozzle/header interfaces of N1 and N2. A finite element (FE) model of the top section was built in FE-Pipe and truncated at the guide, where a fixity boundary condition was assumed. A series of calculations with this model determined the pipe thicknesses, laminate thicknesses and bonding lengths needed to accommodate the specified loads. Lamination is realised by cross-winding GRE laminate over the prefabricated EST header and nozzle assembly.

The resulting reinforced thicknesses were EST16 (17.9 mm) for the header from guide to top, and EST16 at 9.50 mm for N1 and 12.1 mm for N2. Laminate bonding lengths were 3000 mm on the header, measured from the top along the header axis, and 500 mm on N1 and 300 mm on N2, measured along the nozzle from the outside of the header shell. Laminate thickness was 45 mm at the nozzle/shell interface and 25 mm at 70% away from the nozzles.
Part B determined the overall header thickness between the guide and the main deck fixation with a closed-form stress calculation at the fixation for an assumed EST16 pipe. The calculation adds the bending stress from the resultant of the in-plane and out-of-plane moments to the axial stress. The moment components at the fixation were 78 and 45 kNm for the sustained case, 322 and 138 kNm for operation and 520 and 300 kNm for the occasional case, with an axial load of 390 kN in all three. The axial load was taken as 100% sustained because the load fractions in the client table did not sum for the vertical component.
A separate consideration was the guide itself. The specified guide loads cause the steel shoe ring to exert a surface pressure on the GRE header. This surface pressure was calculated and checked against the allowable: the pipe could carry it with the total thickness shown on the design drawings at the guide, a reinforced thickness of 23.7 mm on an outer diameter of 1447.4 mm. To keep local stresses near the ends of the steel shoe ring within the material allowable, the analysis advised lengthening the ring to at least 800 mm, with a resulting pipe reinforcement length of at least 900 mm. It also advised tapering the ends of the pipe reinforcement. A neoprene wrapping between the GRE pipe and the steel shoe ring is necessary to ensure a well-distributed surface pressure.
Axial Stress Results and Flange Equivalent Pressure
The maximum axial discontinuity stresses from Part A were 14 MPa for the sustained case against a 25 MPa allowable, 25 MPa for operation against 30 MPa, and 33 MPa for occasional against 33 MPa; the occasional value equals the allowable. The highest stresses generally occurred near the nozzle/shell interface of N1. Away from the discontinuities, the maximum bending stress in the header was approximately 8 MPa for the sustained case and 18 MPa for operation. With the thicknesses and bonding lengths above, no stress exceeds its allowable.


Axial stress on the outside of the shell of the GRE caisson top section, occasional load case (scale -33 to 33 MPa).
The Part B calculation for the EST16 wall gave approximately 9, 18 and 27 MPa for the sustained, operation and occasional cases, against allowables of 25, 30 and 33 MPa. An EST16 (17.9 mm) pipe is therefore adequate between the guide and the fixation under the specified loads.
| Load case | Part A max. axial discontinuity stress (MPa) | Part B stress at main deck fixation (MPa) | Axial allowable (MPa) |
|---|---|---|---|
| Sustained | 14 | approx. 9 | 25 |
| Operation | 25 | approx. 18 | 30 |
| Occasional | 33 | approx. 27 | 33 |
For the flange connecting the caisson to the main deck, the 390 kN axial tension load and a 600 kNm bending moment were converted into an equivalent pressure of 13.8 bar. The 600 kNm is the resultant of the occasional-case moment components at the fixation. The header inner diameter was conservatively used as the sealing diameter because the effective sealing circle was not known. The equivalent pressure plus the 3.5 barg design pressure gives a total of 17.3 bar, to which the flange is to be sized.
Load Basis and Guide Support Findings
Two points from this analysis are worth recording. First, the specified interface loads appear to have been derived without the caisson’s flexibility being modelled, and they did not form an equilibrium set. Applying them as specified most probably resulted in a conservative design.

Second, at the guide, the thickness shown on the drawings carried the surface pressure from the steel shoe ring. The recommended ring and reinforcement lengths relate to the local stresses near the ring ends, and the neoprene wrapping to the distribution of the surface pressure.
Frequently Asked Questions
How are client nozzle loads handled when they do not form an equilibrium set?
For the header between the guide and the main deck, a worst-case load scenario at equilibrium could not be generated. The highest loads were therefore assumed to occur at the main deck fixation, where the in-plane and out-of-plane bending moments and the axial load make the largest contribution to the total stress. A closed-form calculation there for an EST16 pipe gave approximately 9, 18 and 27 MPa against allowables of 25, 30 and 33 MPa.
What laminate thickness and bonding lengths were needed at the GRE nozzle connections?
The FE-Pipe calculations gave a laminate thickness of 45 mm at the nozzle/shell interface and 25 mm at 70% away from the nozzles. Bonding lengths were 3000 mm on the header, measured from the top along the header axis, and 500 mm on the 30-inch N1 and 300 mm on the 16-inch N2, measured along the nozzle from the outside of the header shell.
Which ISO 14692 allowable stresses applied to the GRE caisson?
Based on the pipe supplier’s material data and ISO 14692, with a lower confidence limit of 125 MPa, the axial allowables were 25 MPa for sustained, 30 MPa for operation and 33 MPa for occasional loads. The hoop allowables were 80, 100 and 110 MPa.
How was the flange sized for bending moment and axial load?
The 390 kN axial tension load and the 600 kNm resultant bending moment were converted into an equivalent pressure of 13.8 bar, with the header inner diameter used as the sealing diameter because the effective sealing circle was not known. Adding the 3.5 barg design pressure gives 17.3 bar, to which the flange is to be sized.
What was recommended at the steel guide ring on the GRE caisson?
To keep local stresses near the ring ends within the material allowable, the steel shoe ring should be at least 800 mm long, with a pipe reinforcement length of at least 900 mm. Tapering the ends of the pipe reinforcement was also advised. A neoprene wrapping between the steel ring and the GRE pipe is necessary to ensure a well-distributed surface pressure.