Flexibility Analysis of a 42-Inch Inlet Header for an Offshore Compressor Plant

ON THIS PAGE

A 42-Inch Inlet Header for Five Offshore Compressor Stations

An offshore compressor plant was designed with five very similar compressor stations, all connected by one 42-inch inlet header. Gas arriving from the bridge is first directed through the main inlet separator, and the header then carries it to the individual compressor stations, where it is compressed.

The site location requires high wind loads to be included, with a wind speed of 240 km/h applied uniformly over the full height of the plant. The piping has a design temperature of 80 °C. In the original configuration of the branch lines from the header to the first-stage scrubbers (V-X01), thermal expansion caused large axial loads on the scrubber inlet nozzles. At the main inlet separator (V-001), the flexibility of the bends downstream of the vessel is required to minimise the axial loads and longitudinal bending moment on the outlet nozzle.

The scope was a flexibility analysis of the header and the initial piping of each compressor station, including assessment of the flanges and vessel nozzles. Piping was assessed to ASME B31.3, flanges against the ASME B16.5 and ASME B16.47 ratings, and vessel nozzles against allowable loads supplied by the client.

CAESAR II Flexibility Model and ASME B31.3 Assessment Basis

The header, together with the initial piping of each compressor station up to the first-stage scrubbers, was modelled and assessed in CAESAR II to ASME B31.3. Conditions do not change along the header, so it runs to one specification throughout. The initial piping of each compressor station runs to a different specification. Earthquake loads were not included.

LineDesign pressureDesign temperaturePipe material
Inlet header15 bar80 °CA106B
Compressor station initial piping25 bar80 °CA106B

Each scrubber was modelled as a large-diameter pipe so that the vertical thermal expansion of the vessel was included. The nozzles were sized as the attached pipe, with their lengths taken from the nozzle locations on the isometrics. Each nozzle was modelled as rigid from the vessel centreline to the vessel wall, so that the thermal expansion of the vessel in the nozzle axial direction was included. From the wall to the attached pipe, the nozzle was modelled as plain pipe with a nozzle flexibility that represents the flexibility of the vessel wall. Vessel wall thickness was estimated from the thickness-to-diameter ratio of the attached pipe.

Model of a scrubber as a large-diameter pipe, with a rigid element from the vessel centreline to the wall and a flanged nozzle.
Scrubber modelled as a large-diameter pipe, with a rigid element from the vessel centreline to the wall and the nozzle and flange beyond.

Nozzle loads were determined in CAESAR II. The forces and moments in the axial, circumferential and longitudinal directions were checked against the allowable loads supplied by the client. These allowables extend only to 24-inch nozzles, while V-001 has 42-inch nozzles and V-X01 has 28-inch nozzles, so allowables for these two sizes were extrapolated from the supplied values.

Flanges were assessed using the equivalent pressure method. The force and moment at the flange face are converted to an equivalent pressure and added to the pressure in the pipe. The total is compared with the allowable flange pressure from the ASME B16.5 rating tables, or ASME B16.47 for the 42-inch flanges.

For gasket diameters below 1,000 mm, where the moment is produced by the force acting 1 m or more from the flange face, the moment term has more influence than the force term. Where possible, flanges were therefore repositioned to reduce the moment at the flange face and so the equivalent pressure. In consultation with the client, the flanges were assessed against the operating allowable using operating conditions. The design conditions were assessed only as an occasional load against the occasional allowable.

Design Modifications to Flanges, Branch Routing and Restraints

A flange connection close to the bends downstream of the main inlet separator made the bends less flexible, because the flanges restrict the deformation of the bends. The flanges were moved slightly away from the bends to reduce their influence on bend flexibility.

The branch line connecting each compressor station to the header was significantly altered from the original configuration to avoid large axial loads, caused by thermal expansion, on the inlet nozzles of the V-X01 vessels. To relieve the loads on the nozzle, a more flexible routing was designed so that the thermal expansion moves towards the header instead of to the vessel. The orientation of the reroute depends on the compressor station number, to avoid pipe clashing.

Small dimensional changes were also made. Where necessary, restraint type and position were changed so that all piping stresses conform to the ASME B31.3 allowables.

ASME B31.3 Stress, Flange Rating and Nozzle Load Results

With the modifications, all piping stresses conform to the ASME B31.3 allowables and are reported as a percentage of the allowable. In sustained load case L5, the highest stress was 84.6% of the allowable, at node 3400. In the expansion load cases, the highest stresses were 24.9% of the allowable in L20, 15.1% in L21 and 11.3% in L22.

Load caseTypeHighest stress (% of ASME B31.3 allowable)
L5Sustained84.6
L20Expansion24.9
L21Expansion15.1
L22Expansion11.3

All flange loads in the inlet header are within the allowable values from the ASME B16.5 rating tables, or ASME B16.47 for the 42-inch flanges.

Vessel shell and nozzle schematic showing the axes of nozzle load components Fx’, Fy’, Fz’, Mx’, My’ and Mz’.
Orientation of the nozzle force components Fx’, Fy’, Fz’ and moment components Mx’, My’, Mz’ on a vessel nozzle.

Not all of the main inlet separator nozzle loads fall within the allowables originally supplied by the client. These loads are lower than the loads previously approved by the client, and are reported as a percentage of those approved loads.

Flange Position and Branch Expansion Direction in Header Design

Alongside the restraint changes, two layout changes in this system were made to limit nozzle loads. Flanges close to the bends downstream of the main inlet separator were moved slightly away so that they have less influence on bend flexibility. The branch lines to the first-stage scrubbers were rerouted so that their thermal expansion moves towards the header instead of the vessel.

In the equivalent pressure check, the moment term has more influence than the force term for gasket diameters below 1,000 mm when the force acts 1 m or more from the flange face. For that reason, flanges in this system were repositioned where possible to reduce the moment at the flange face.

Rerouted branch line at the connection between one compressor station and the inlet header.

Frequently Asked Questions

How is a scrubber nozzle modelled in CAESAR II to include vessel thermal expansion and wall flexibility?

Each scrubber was modelled as a large-diameter pipe, which includes the vertical thermal expansion of the vessel. Each nozzle was modelled as rigid from the vessel centreline to the vessel wall, so that the thermal expansion of the vessel in the nozzle axial direction was included. From the wall to the attached pipe, it was modelled as plain pipe with a nozzle flexibility representing the flexibility of the vessel wall. Vessel wall thickness was estimated from the thickness-to-diameter ratio of the attached pipe.

The force and moment at the flange face are converted to an equivalent pressure and added to the pressure in the pipe. The total is compared with the allowable flange pressure from the ASME B16.5 rating tables, or ASME B16.47 for 42-inch flanges.

For gasket diameters below 1,000 mm, with the moment produced by a force acting 1 m or more from the flange face, the moment term has more influence than the force term. On this system, flanges were repositioned where possible to reduce the moment at the flange face and so the equivalent pressure.

Both, against different allowables. In consultation with the client, operating conditions were assessed against the operating allowable. Design conditions were assessed only as an occasional load against the occasional allowable.

They were extrapolated from the supplied values. V-001 has 42-inch nozzles and V-X01 has 28-inch nozzles. Forces and moments in the axial, circumferential and longitudinal directions were then checked against these allowables.

The branch line from the header to each first-stage scrubber was significantly altered from the original configuration. A more flexible routing was designed so that the thermal expansion moves towards the header instead of to the vessel. The orientation of the reroute depends on the compressor station number, to avoid pipe clashing.

A flange connection close to a bend restricts the deformation of the bend and makes it less flexible. Downstream of the main inlet separator, bend flexibility is required to minimise the axial loads and longitudinal bending moment on the V-001 outlet nozzle, so the flanges there were moved slightly away from the bends.

In sustained load case L5, the highest stress was 84.6% of the allowable, at node 3400. The expansion load cases peaked at 24.9% of the allowable in L20, 15.1% in L21 and 11.3% in L22.