
FEA Analysis For Internal Gas Distributors
Introduction This study detailed the mechanical calculations for four internal components designed as gas inlet distributors within a pressure vessel. These internals were welded to

Introduction This study detailed the mechanical calculations for four internal components designed as gas inlet distributors within a pressure vessel. These internals were welded to

Introduction In the past, visible vibrations were observed in the piping connected to hydrogen compressors. These vibrations were particularly noticeable in the small-bore pipes branching

Introduction In this case study, a burst test was conducted to demonstrate the strength of a DN1200 Glass Fiber Reinforced Plastic (GRP) pipe. The objective

Introduction In the context of a compression station project, DRG conducted a comprehensive static stress analysis encompassing the plant inlet, slug catcher, and filter areas.

Introduction In this case study, we delve into a static stress analysis concerning a distillate water header within a remineralization unit of a desalination plant.

Introduction In the analysis conducted for the gas-inlet top box of a heat exchanger, which forms a part of the Torrefaction Tower, emphasis was placed

Introduction In the context of a greenfield project centered on the construction of a power plant, fiberglass-reinforced plastic (GRP) pipes with diameters of approximately 2.5

Since its beginnings, in 1989, Dynaflow Research Group (DRG) has been involved in shaping the landscape of fiberglass engineering through research, design engineering, and consultancy.

Introduction In this case, slender steel conical towers are designated to support high-tension wires, subjecting them to various horizontal and vertical load components. The load

Introduction In the examination of our client’s initiative to assess and enhance the primary cooling water system within an established power plant, various configurations, and

Date: April 2nd, 2024 We are delighted to announce the celebration of Dynaflow Research Group’s 35th anniversary, marking a significant milestone in our journey of

Introduction The seawater system was classified as a class A system per the Service Limit State (SLS) standards. Constructed from reinforced fiberglass piping, it comprised

Introduction In this case study, the focus was on conducting a stress analysis of the GRE piping system utilized to link the pumps to the

Introduction As a result of a failure in a fiberglass header in the undercroft of a chilled water system, the decision was made to replace

Introduction In this case study, we delved into the stress analysis findings regarding the revised flue gas overhead line in Singapore connecting a third-stage separator

Introduction In the current project, a static stress analysis was conducted to assess the performance of GRE headers connected to filter vessels. The purpose was

Introduction In this case study, a finite element stress analysis was conducted on a seawater dump caisson installed on the deck of a floating offshore

Introduction A plant in Asia requested a simulation study to be performed, both fluid mechanical (acoustical) and mechanical, of the compressor piping between the first

Introduction A serious crack next to a weld in the circulating water flow system was found but it was unclear what had caused this crack.

Dynaflow Research Group is pleased to announce the new major releases of all of the DRG software products, including BOSfluids, BOSpulse, ISOtracer, and BOSview. Version 7.1.

Dynaflow Research Group will be one of the exhibitors at TPS Turbomachinery & Pump Symposia (TPS) in Houston, Texas. TPS is a vital industry event,

Table of Contents A Good GRP Code Covers a Large Variety of Products and Loading Conditions A robust Glass Reinforced Plastic (GRP) piping code must

Thermal bowing is a structural phenomenon that arises when a temperature gradient exists across the cross-section of a pipe or vessel. In typical pipe design,

Table of Contents As the demand for flexible, energy-efficient, and reliable compressor operation grows—particularly in hydrogen and process gas applications—our clients increasingly turn to stepless

Table of Contents Multiphase flow is a recurring challenge in process engineering, where multiple fluid phases—such as gases, liquids, or solids—interact within a single flow

In the chemical and energy industries, liquid products such as LNG, ammonia, or naphtha are commonly transferred between ships and onshore storage tanks. These transfers

In the engineering domain, accurately simulating transient events in pipeline systems is critical, particularly for essential safety mechanisms such as firewater systems. These systems, typically

Introduction Pressure vessels are critical components in a wide range of industries, including power generation, petrochemical processing, and industrial manufacturing. These vessels are designed to

When Theodor von Kármán first discovered vortex shedding in 1911, he likely had no idea how pivotal his work would become for modern engineering, particularly

In a previous article, we introduced the risks and design considerations of repurposing an existing natural gas compressor system for hydrogen. That discussion focused on

ON-DEMAND 🕖 50 MIN 🌏︎ ENGLISH Acoustically Induced Fatigue in Gas Filled Piping Systems Using BOSfluids Remco Boere Senior Software Engineer Get instant access

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Simulation Strategies and Practical Application for Vapour Cavity Formation Dr. Ir. Erik Jan Lingen Software Director Get

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Fundamentals, Failure Mechanisms, and Engineering Consequences of Vapor Cavity Formation Dr. Ir. Erik Jan Lingen Software Director

ON-DEMAND 🕖 45 MIN 🌏︎ ENGLISH Bridging the Gap: From NFPA 15 Steady-State Design to Transient Surge Analysis in Tank Terminals Uri Peker

ON-DEMAND 🕖 45 MIN 🌏︎ ENGLISH Support Stiffness Effects on Mechanical Natural Frequencies in Reciprocating Compressor Piping Systems Thijs Krijger Project Engineer Get

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Beyond hydraulics: a practical guide to fire water analyses with BOSfluids Dr. Ir. Erik Jan Lingen Software

AIV Fundamentals At what pipe diameter and wall thickness should one be concerned about AIV? What is the relevant D/T ratio? This depends on the

ON-DEMAND 🕖 3 SESSIONS x 45 MIN 🌏︎ ENGLISH Complete Pulsation Analysis Using BOSpulse Tim Gebraad Software Lead Engineer Marienne Faro Software Sales Engineer

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Getting the Timing Right: Why Time Step Size Is Critical In Surge Analysis Dr. Ir. Erik Jan

ON-DEMAND 🕖 30 MIN 🌏︎ ENGLISH Protecting Tank Terminal Assets Through Surge and FFS Analyses Thijs Krijger Project Engineer Katrine van Overhagen Engineer

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Choosing the right GRE piping standard: a comparison of ISO 14692 and ASME NM.2 Edwin Schimmel Project Engineer

ON-DEMAND 🕖 50 MIN 🌏︎ ENGLISH How Stepless Capacity Control Shapes Flow and Pulsations Thijs Krijger Project Engineer Get instant access Free. Recording

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Water Hammer Analysis & Mitigation in Pipeline Systems with BOSfluids Dr. Ir. Erik Jan Lingen Software Director

ON-DEMAND 🕖 60 MIN 🌏︎ ENGLISH Water Hammer Analysis & Mitigation in Pipeline Systems with BOSfluids Dr. Ir. Erik Jan Lingen Software Director

ON-DEMAND 🕖 35 MIN 🌏︎ ENGLISH Understanding, Modelling, and Managing Thermal Bowing using CAESAR II David Tickner Senior Engineer Get instant access Free.

What are the key challenges in applying CFD to simulate and optimize multiphase processes in complex industrial systems? The main challenge here is the ability

Do CAESAR II formulas for thermal bowing and output results match with FEA? Short Answer: There can be significant differences between the results of CAESAR II and FEA.Explanation:The

ON-DEMAND 🕖 35 MIN 🌏︎ ENGLISH Using CFD for optimizing multiphase process engineering Bart van der Zalm Senior Engineer Get instant access Free.

DRG CONFERENCE – 35TH ANNIVERSARY 🌏︎ ENGLISH Innovations that Change the Engineering Industry Get instant access Free. Recording + slide deck available Event Description

ON-DEMAND 🕖 35 MIN 🌏︎ ENGLISH Fatigue Assessment According to ASME B&PV VIII Div.2 Lukas Bajarunas Senior Software Engineer Get instant access Free

ON-DEMAND 🕖 45 MIN 🌏︎ ENGLISH Fiberglass Piping Stress Envelope According to ISO 14692 using CAESAR II Edwin Schimmel Project Engineer Get instant

Weld 34 Crack and Dead-End Configuration The circulation system has two pumps, one operating and one spare. The operating pump feeds cooling water back into the Benson vessel at the top of the system. In the situation analysed, one pump had been taken out for revision. A blind valve was

Branch Failures in a Buried GRP Firewater Ring The firewater system is made from glass-reinforced plastic (GRP) pipe and is mainly underground. The main is a ring with large-bore branch connections, and smaller-bore branch connections feed the hydrants and monitors above ground. In early operation the system suffered a number

Slug Flow Operation and Two Elbow Fatigue Failures At a gas-to-liquids facility, the water feed line to an HCN/NH3 stripper (1C-1201) regularly operated in the slug flow regime. Slugs can generate large dynamic loads on the piping, which can eventually result in fatigue failures. Two leakage incidents occurred, each caused

Flange Leakage in 44-Inch Catalytic Oxidiser Piping The 44-inch top and bottom nozzles of a catalytic oxidiser are connected to the shell and tube sides of a recuperative heater by 44-inch piping. The hot design temperature is 527 °C. The required piping flexibility is provided by a number of expansion

Steam-Out Cycles of the Carbon Bed Vessels In the offgas cleaning system of an EBHP reaction section, vessels V105A to V105D absorb EB from the offgas on active carbon beds, because the EB has to be removed before flaring for environmental reasons. Once a bed is saturated, it is steamed

A Branch Failure on a Methanol Plant Steam Header A methanol plant operating on a 3,000 tonnes per day basis suffered a piping failure on 19 May 2012. A ¾ inch branch broke off the medium-pressure (MP) steam header when the turbine driving the synthesis gas compressor tripped. In normal

A pulsation analysis to API 618 Design Approach 1 checked the proposed dampener bottles of onshore and offshore reciprocating compressors against a guideline of 70 percent of the allowable pulsation levels. All proposed bottles gave levels within the API 618 allowable. At the line connection nozzle, only the offshore discharge

Condensate Forwarding Duty at a Nigerian Gas Plant At a gas plant in Nigeria, four reciprocating pumps on an N+1 philosophy (three running, one spare) forward condensate from a storage and separation tank into a gas pipeline. A 12-inch suction header carries the condensate from the tank to the pumps,

Severe Vibration in Vaporiser Feed Pump Piping The suction and discharge piping connected to the quadruplex methanol vaporiser feed pumps was suffering from severe vibration. A pulsation analysis combined with a mechanical response analysis of the as-built piping was performed to establish the root cause. The analyses determined the stress

At the Utorogu Flow Station in Nigeria, vibration was observed in the suction header, the discharge header and the pump recirculation line. Dynaflow Research Group performed pulsation, mechanical response and static stress analyses to find the root cause, identify any other possible problems and recommend improvements. The station pumps crude

A third-party review of the HP discharge line at a gas compression station found that the designer’s stress report shows the discharge nozzle conforming to the vendor’s allowable values with the springs pinned, as API 686 requires. At the 7th April alignment check the flange separation exceeded the 4.5mm vendor

A new natural gas booster plant at Winksele, Belgium, was undergoing Site Approval Tests (SAT) after the end of construction. The SAT scope included a pipe vibration level assessment to verify that all vibration levels were within acceptable limits. This case study describes the measurement campaign and the VDI 3842

Compressor Suction Strainer and Its Fatigue Cracking The suction strainer of a centrifugal compressor developed fatigue cracks. The strainer is a perforated stainless steel truncated cone (Werkstoff 1.4571), 970 mm long, with an outside diameter of 160 mm at the upstream end and 420 mm at the downstream end. The

Operating Context and Damper Configuration Assumed At a plant in Qatar, a Dresser Roots compressor compresses seal gas in two stages. The client requested a simulation study, both acoustic and mechanical, of the compressor piping between the first-stage discharge and the second-stage suction. The second-stage bypass lines are included. The

Why Pulsation Risks Warranted Attention Before Operation The compression station was designed to increase and maintain operating pressure on a natural gas piping network, overcoming friction losses. It has four (3+1) two-stage centrifugal compressors with 19-blade impellers, running at a rated speed of 5750 RPM (95.8 Hz) within a range

A Commissioning Failure That Sent Debris Downstream During commissioning of a natural gas compressor station, pieces of fibreglass fabric, mineral wool and steel wire were found throughout the downstream system. A small amount of mineral wool was also found in the surge valve. Inspection showed that the mineral wool found

Compressor Piping Under Combined Marine and Process Loading The compressor module was located roughly halfway along the hull. Its connected piping had to accommodate thermal and pressure loads, wind loads, accelerations from wave-driven barge rocking and relative displacements from hull deformation. These loads could produce pipe deflection and bending and

Cyclic Thermal Duty in a Gas Treatment Air Cooler An air-cooled heat exchanger for a gas treatment plant is subjected to a varying inlet temperature. In the analysed winter case, which has the largest temperature variation, the fluid cycles between 7.5°C and 288°C during each 100-minute cycle. The first part

Consolidating Gas Flow onto a Single Metered Line A platform gas metering station has three parallel metering lines, two active and one spare. The modification replaces the orifice-type flow meter in the most eastern line with an ultrasonic (US) flow meter and directs the complete gas flow through that line.

Nitrogen Skid Stress Verification Requirement A manufacturer produces a nitrogen metering skid for a project. As a result of a client performance requirement, the existing design had to be verified by stress analysis. The skid is a straight pipe configuration with valves and flow meters, supported approximately 1000 mm above

An axisymmetric finite element analysis checked the flued flange expansion joint of a fixed-fixed tubesheet reboiler for low cycle fatigue, high cycle fatigue and primary stress to ASME Section VIII Division 2, at mean (26 mm) and minimum (22 mm) wall thickness. The largest low cycle fatigue stress range was

DYNAFLOW RESEARCH GROUP (“DRG”) Enters into Reseller Agreement with Quality Professional Software (“QPS”) RIJSWIJK, The Netherlands – January 24, 2024 (Dynaflow Research Group BV) –

Dynaflow Research Group and Seawind Ocean Technology announce collaboration focusing on technical readiness of floating offshore wind applications in the Mediterranean Sea. This landmark partnership